Project for Upgrading the Pumping Stations of the Water Transmission Systems

By NWWC
الشركة الوطنية لاعمال المياه

client

Saudi Water Authority

History

2024

Location

Abha

Application

Pumping Station

Project for Upgrading the Pumping Stations of the Water Transmission Systems

Project for Upgrading the Pumping Stations of the Water Transmission Systems – Upgrading 6 existing pumps and adding 2 new pumps. The scope also includes the supply and installation of valves, pipes, and accessories required for the two new pumps, the supply of one ATT autotransformer, and the supply of two control units for the new pumps, with integration into the existing system control network.

Related Projects

مشروع محطة الخمرة بجدة

Al-Khumra Station Project – Jeddah

مشروع نقل الشقيق

Al-Shaqiq Transmission Project

Completion of Water Supply from Saad Wells Field – Phase Six (Electrical Systems)

Completion of Water Supply from Saad Wells Field – Phase Six (Electrical Systems)

Send us your message now and we will get back to you as soon as possible

Do you have a question? Let us be with you on the first step towards success!

We listen to you. We study your needs. We support you from the first consultation to the completion of the project.
Start now. Become a partner in success.