Project for the Implementation of Drinking Water Networks in Alma’a Governorate – Contract No. 1 in the Asir region, with a total length of 68,410 meters using high-density polyethylene (HDPE) pipes with diameters of 100, 160, 200, and 250 mm, and ductile iron pipes with diameters of 300 mm, 400 mm, and 500 mm with a total length of 13,590 meters. The works include the installation of gate valves, scour valves, air valves, washouts, pressure-reducing valves, flow meters, fire hydrants, and their concrete chambers, along with other related works as specified in the contract documents. Additionally, the project includes horizontal directional drilling (HDD), concrete encasement of pipes, utility relocation, and other works as detailed in the contract documents, as well as connection works to existing desalination tanks in Al-Sha’abayn and other associated works as specified in the contract documents.