{"id":4743,"date":"2025-06-25T10:59:05","date_gmt":"2025-06-25T10:59:05","guid":{"rendered":"https:\/\/almousa.group\/saudi-sdn-water-energy-company-implements-one-of-the-kingdoms-major-strategic-water-transmission-projects\/"},"modified":"2025-08-12T12:16:09","modified_gmt":"2025-08-12T12:16:09","slug":"saudi-sdn-water-energy-company-implements-one-of-the-kingdoms-major-strategic-water-transmission-projects","status":"publish","type":"post","link":"https:\/\/almousa.group\/en\/saudi-sdn-water-energy-company-implements-one-of-the-kingdoms-major-strategic-water-transmission-projects\/","title":{"rendered":"Saudi Sdn Water &amp; Energy Company Implements One of the Kingdom\u2019s Major Strategic Water Transmission Projects"},"content":{"rendered":"\n<p>Saudi Sdn Water &amp; Energy Company \u2013 a subsidiary of Al Mousa Group \u2013 continues its leading role in executing vital projects through its commencement of work on the project to increase the capacity of the \u201cLifeline\u201d water transmission line from Hali Dam, commissioned by the Water Transmission Company (WTC). This project is considered one of the largest strategic initiatives in the Kingdom\u2019s water sector.<\/p>\n\n\n\n<p>The project extends over a distance exceeding <strong>348 kilometers<\/strong> and aims to enhance water transmission efficiency and ensure sustainability to meet current and future needs. It consists of three integrated implementation packages:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Package One:<\/strong> Starts from Hali Dam and includes the construction of a discharge and pumping station with a production capacity of <strong>205,000 cubic meters per day<\/strong><strong>, <\/strong>featuringfive main pumping units eachwithacapacityof<strong>2,135 cubic meters per hour<\/strong><strong>.<\/strong><\/li>\n\n\n\n<li><strong>Package Two:<\/strong> Includes establishing a new pumping station in Al Lith area with a production capacity of<strong>234,800 cubic meters per day<\/strong>, comprising two reservoirs with a storage capacity of <strong>25,000 cubic meters<\/strong> each and five main pumping units.<\/li>\n\n\n\n<li><strong>Package Three:<\/strong> Covers the route from Al Shuaiba to Al Lith station and involves replacing ductile iron pipes with<strong>1,400 mm carbon steel pipes<\/strong>, spanning over <strong>81 km<\/strong>, along with comprehensive renewal of all ventilation and drainage stations along the line.<\/li>\n<\/ul>\n\n\n\n<p>This project reflects Saudi Sdn\u2019s and Al Mousa Group\u2019s commitment to supporting <strong>Saudi Vision 2030<\/strong> by delivering sustainable and efficient infrastructure projects that contribute to enhancing water security and achieving balanced development across the Kingdom\u2019s regions.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"900\" height=\"506\" data-id=\"2067\" src=\"https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/4.jpg\" alt=\"\" class=\"wp-image-2067\" srcset=\"https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/4.jpg 900w, https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/4-300x169.jpg 300w, https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/4-768x432.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption class=\"wp-element-caption\">default<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"900\" height=\"506\" data-id=\"2066\" src=\"https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/3.jpg\" alt=\"\" class=\"wp-image-2066\" srcset=\"https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/3.jpg 900w, https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/3-300x169.jpg 300w, https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/3-768x432.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption class=\"wp-element-caption\">default<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"900\" height=\"505\" data-id=\"2065\" src=\"https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/2.jpg\" alt=\"\" class=\"wp-image-2065\" srcset=\"https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/2.jpg 900w, https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/2-300x168.jpg 300w, https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/2-768x431.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"505\" data-id=\"2064\" src=\"https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/1.jpg\" alt=\"\" class=\"wp-image-2064\" srcset=\"https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/1.jpg 900w, https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/1-300x168.jpg 300w, https:\/\/almousa.group\/wp-content\/uploads\/2025\/06\/1-768x431.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Saudi Sdn Water &amp; Energy Company \u2013 a subsidiary of Al Mousa Group \u2013 continues its leading role in executing vital projects through its commencement of work on the project to increase the capacity of the \u201cLifeline\u201d water transmission line from Hali Dam, commissioned by the Water Transmission Company (WTC). This project is considered one [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3824,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[76],"tags":[],"class_list":["post-4743","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-saudi-sdn"],"acf":[],"_links":{"self":[{"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/posts\/4743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/comments?post=4743"}],"version-history":[{"count":6,"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/posts\/4743\/revisions"}],"predecessor-version":[{"id":5567,"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/posts\/4743\/revisions\/5567"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/media\/3824"}],"wp:attachment":[{"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/media?parent=4743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/categories?post=4743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/almousa.group\/en\/wp-json\/wp\/v2\/tags?post=4743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}